The Town has successfully competed the repairs to Mast Landing Boat ramp and docks. The work included the installation of the new ramp, comprehensive dock repairs, and the addition of new sturdy pylons. After water level was returned to proper…
The Town has successfully competed the repairs to Mast Landing Boat ramp and docks. The work included the installation of the new ramp, comprehensive dock repairs, and the addition of new sturdy pylons. After water level was returned to proper…
Lake levels have decreased by about four feet since the commencement of the drawdown. We've received word from the Wolfeboro Public Works that the lake level will continue to be held at its current level until December 15 to allow…
As a reminder, this year is a draw down year. Beginning on September 10, the water level is to be drawn down to 30.70 on the gauge by the following October 10 and held at that level until the following…